b'Additional building wrap with 75mm cover tohead flashing.Timber wall framing with wall insulation as all Selected fibre cement cladding as specified by150 upstandspecified by Architect. Architect on 20mm H3.1 vertical battens to formcavity. Fix in accordance with manufacturersBuilding wrap to return into louvre opening. recommendations.Provide flashing tape over wrap as per WANZ uPVC vent strip.window installation system. 15mm drip edge to claddingHead trimmer or lintel as required to span 5 40mm cover to joineryopening.40 x 40 x 3 fixing angle pop rivited to back of Inseal tape between joinery and flashing.frame @ 300mm c/c. Fix to platewith wood screws @ 300mm c/c. Purpose made aluminium head flashing with15 slope to extend 150mm behind cladding.Osbournes Model WPL80 (Flanged). Provide 40mm min cover to head of louvre withdrip edge and stop ends.Model WPL 80 (Flanged Frame)Typical Fibre Cement/Louvre Head Detail 01 Osbournes LtdScale 1:5Selected fibre cement cladding as specified byArchitect on 20mm H3.1 vertical battens to formTimber wall framing with wall insulation as all cavity. Fix in accordance with manufacturersspecified by Architect. recommendations.Trimmer stud. 5 gap Sikaflex-20AT or similar approved sealant.45mm H3.1 treated packer to stop above sill Head flashing extends 50mm past flangetrimmer to allow sill flashing to finish hardagainst trimmer stud. 30mm min cover40 x 40 x 3 fixing angle pop rivited to back of 3108 Inseal tape 12mm thick x 10mm wide.frame @ 300mm c/c. Fix to plate Building wrap to return into louvre opening.with wood screws @ 300mm c/c. Provide flashing tape over wrap as per WANZLine of sill flashing under. window installation system.Osbournes Model WPL80 (Flanged). Line of head flashing.Model WPL 80 (Flanged Frame)Typical Fibre Cement/Louvre Jamb Detail 02 Osbournes LtdScale 1:5Page 15'