b'Additional building wrap with 75mm cover tohead flashing.Timber wall framing with wall insulation as all Selected profiled exterior metal sheet150 upstandspecified by Architect. cladding on 20mm H3.1 vertical timber battensto Architects specification.Building wrap to return into louvre opening.Provide flashing tape over wrap as per WANZ uPVC vent strip.window installation system. 15mm cover to claddingHead trimmer or lintel as required to span 5 45mm min cover to joineryopening.40 x 40 x 3 fixing angle pop rivited to back of Inseal tape between joinery and flashing.frame @ 300mm c/c. Fix to platewith wood screws @ 300mm c/c.Purpose made head flashing with 15 slope toOsbournes Model WPLVertical 100 (Flanged). extend 150mm behind cladding. Provide 45mmmin cover to head of louvre with drip edge andstop ends.Model WPL Vertical 100 (Flanged Frame)Typical Horizontal Corrugate/Louvre Head Detail 01 Osbournes LtdScale 1:5Close end of flashing and scribe to suit claddingprofile. Selected profiled exterior metal sheetcladding on 20mm H3.1 vertical timber battensTimber wall framing with wall insulation as all to Architects specification.specified by Architect. 50mm min coverCompressible foam.5Preformed jamb flashing. 50mm min35mm H3.1 treated packer to stop above silltrimmer to allow sill flashing to finish hard 5 40mm min cover to flashingagainst trimmer stud.40 x 40 x 3 fixing angle pop rivited to back of 3108 Inseal tape 12mm thick x 10mm wide.frame @ 300mm c/c. Fix to platewith wood screws @ 300mm c/c. Building wrap to return into louvre opening.Provide flashing tape over wrap as per WANZLine of sill flashing under. window installation system.Osbournes Model WPLVertical 100 (Flanged). Line of head flashing.Model WPL Vertical 100 (Flanged Frame)Typical Horizontal Corrugate/Louvre Jamb Detail 02 Osbournes LtdScale 1:5Page 41'